Satisfactory guides: Use your factory as the checkpoint
Your factory grows across several sessions. When setting up the server or transferring data, the correct save is the measure of success. Choose the guide for the step you need to complete.
Open the instructions
Identify the save unambiguously
Record which file belongs to the intended session and when it was backed up. Keep the original version separately. This prevents a new test state from accidentally becoming the only remaining copy.
Test against the familiar project afterwards
Have another player join and inspect a familiar part of the factory. A running server with a different save does not fulfil your goal. If problems occur, return to the last verified step of the instructions.
Preparation questions
How do I recognise a successful transfer?
The group can join and finds the intended progress. Check a specific construction area rather than relying solely on server status.